Collect / Guide 03

Collect SME Inputs With an Evidence Request Sheet

Ask specialists for checkable inputs instead of “a few paragraphs,” and keep unknowns visible.

Subject matter experts usually know more than a proposal coordinator about the work being proposed. They may still need a precise request to turn that knowledge into usable response material. “Please send something about operations” invites a general overview. A focused input sheet asks for a particular decision, source or explanation and shows where it will be used.

This is an internal coordination method, not a government-required form. Use your organization’s approved systems for sensitive material. The examples are fictional. Do not copy fictional staffing, procedures, client work or metrics into a real proposal.

Ask for the smallest useful input

Break a large section into questions that an expert can answer from evidence. A request for a workflow diagram should identify the start and end of the workflow, the handoffs to explain, and the assumptions that still require approval. A request for a credential should identify whose credential is relevant, what current evidence is acceptable internally, and who will check whether the solicitation asks for it.

The input request should reference the actual buyer instruction and the outline location. That context tells the expert why you need the information. GSA’s guidance distinguishes understanding the work from presenting the response. Your request sheet helps connect those activities; it does not decide which approach the company can truthfully offer.

Use a request that can be accepted or returned

Fictional SME request for a records-support response
Request fieldExample entry
Request ID / destinationINPUT-04 / Technical §2, workflow
QuestionWho checks an indexed record before it moves to delivery, and how are exceptions returned?
Evidence requestedApproved procedure title, current owner and an authorized diagram or explanatory notes
BoundariesDo not send customer records, personal data or restricted contract material
Owner / internal due dateOperations lead / team’s planned input milestone
Open assumptionProposed buyer workflow differs from the existing process; feasibility review still needed

Distinguish an answer from a source

An expert’s explanation may tell the writer what to say, while a current procedure or approved fact record supports why it is accurate. Track both. If the only source is an informal recollection, label it as unverified and ask who can validate it. Do not transform “I think we handled something similar” into a named project or a measured result.

Ask for the relevant excerpt or location within an approved internal record, not a dump of unrelated files. Keep permissions attached to the material. A source may be valid for internal review while still being unsuitable for disclosure to a buyer. The coordinator should route release questions to the person authorized to decide them.

Make follow-up questions neutral

When an input is incomplete, identify the specific gap: “The steps are clear; who authorizes exception closure?” is easier to answer than “This needs more detail.” If two experts disagree, preserve both positions in an issue record and request a decision from the accountable owner. Editing away the disagreement can hide a substantive delivery risk.

Set an internal response date early enough to allow verification and revision. Explain the output format: bullets, a short diagram or answers to numbered questions may be more useful than polished prose. The writer can later shape approved inputs into the required response structure without asking the expert to guess the full document style.

Close the loop before drafting is complete

Return the relevant draft section to the fact owner for a focused check. Ask whether the proposed process is accurate, whether any statement overcommits the team, and whether the evidence may be used in this response. Record the approval and version. A review of an early paragraph does not automatically approve later edits.

Keep a simple state for each request: requested, received, clarification needed or approved for this use. These are workflow labels, not compliance ratings. Before final assembly, ensure unresolved requests appear in the questions and decisions log. The goal is a response built from verified inputs, with each remaining uncertainty visible to the person releasing it.